Year: 2013-2015

Traffic management during the construction work of Tallinn roundabout Kurna traffic joint and multi-level crossing. Work was performed from Tallinn-Tartu road Jüri roundabout till Luige hamlet (traffic frequency over 10 000 vehicles per day). The first part of the site – Kurna-Luige was completed in 2014 and the second part in the end of 2015. This section of Tallinn roundabout consists now of four lanes and there are no crossings regulated with a traffic light.